Mount Carlton

SCOPE OF WORK: To develop a small, remote dredge, compact enough to be deployed in small, hard to reach reservoirs like process water tanks. CHALLENGES FACED: Process water tanks often contain high levels of target minerals, and cleanouts are necessary to restore both water capacity and enable recovery of this product. These reservoirs are...

Read More

Yancoal Mount Thorley Warkworth TP4

SCOPE OF WORK: To remove an estimated 50,000m3 of material from the TP4 dam and deposit it approximately 1.2 km’s away using a slurry booster pump. CHALLENGES FACED: Due to the time-critical nature of this project, site requested that 24 hour, 7 day per week operations be conducted. The dam contained an accumulation of...

Read More

Yancoal Mount Thorley Warkworth 12N

SCOPE OF WORK: Maxitool Australia was engaged to desilt the 12N Dam at Yancoal’s Mount Thorley Warkworth Operations. The aim was to increase the dams’ water holding capacity. The 12N dam is the main water source for the North CHPP plant. CHALLENGES FACED: Firstly, we conducted a Hydrographic Survey of the dam using our...

Read More

BMA Goonyella RS2

SCOPE OF WORK: Maxitool Australia was engaged to desilt the RS2 dam which is the first in a series of return water dams for the Goonyella Riverside CHPP operations. CHALLENGES FACED: Due to a lack of effective maintenance in the past, the RS2 Dam was so full that silt was making its way into...

Read More

BMA Goonyella GS4A

SCOPE OF WORK: Maxitool Australia was engaged to desilt GS4A which is the final sediment catchment pond for Goonyella Riverside mine before the silt flows into Eureka Creek and off site. CHALLENGES FACED: A lack of anchor points on shore and the restrictions on using screw pile anchors due to the risk of ground...

Read More
Page 1 of 4